Hays County Septic

Emergency repairs, and the 72 hours that follow

Texas does not make you wait for a permit while sewage is on the ground. It does make you tell the county afterwards, and quickly.

Verified as of September 11, 2026. We re-check these pages quarterly.

The rule

A permit is not required for emergency repairs. But those repairs must be reported to the permitting authority in writing within 72 hours after repairs have begun — not after they finish. The clock starts when work starts.

Emergency repairs are defined at 30 TAC Subchapter D, §285.35.

What counts

The examples TCEQ gives include:

  • Replacing tank lids
  • Inlet and outlet devices
  • Repairing risers and riser caps
  • Repairing or replacing disinfection devices
  • Repairing damaged drip irrigation tubing
  • Repair of solid lines

The common thread: restoring a broken component to working order. A cracked lid is a genuine safety hazard and nobody expects you to leave it open for a week.

What does not count

Anything that constructs, alters or extends the system needs a permit and an approved plan. Replacing a failed drain field is not an emergency repair. Adding capacity is not an emergency repair. Swapping a failed aerobic unit for a different model is not an emergency repair.

The distinction is repair versus change. If the system will be different afterwards, it is not covered.

Why the report matters more than it looks

Two reasons.

It protects the work. An unreported repair is, on the county's records, an unexplained alteration. When the property sells, or when the next maintenance report raises a question, there is no documentation that the work was legitimate.

It protects a grandfathered system. A system installed before a local program existed, or before September 1 1989, keeps its status only while it is not in need of repair and has not been altered. A properly reported emergency repair is part of showing the system has been kept in order.

In practice

If we do emergency work for you, the written notice to the permitting authority is part of the job, not an extra. Ask any contractor whether they are filing it. If the answer is vague, that tells you something about the rest of their paperwork.

Emergency service

Get started

Book a visit or get a price

Backing up? Send this and we'll come straight back to you.

Starting or moving a maintenance contract, or pricing a replacement. Use the details box for the system brand, whether it is currently under contract, or a closing date if you are buying or selling.

All work is performed by TCEQ-licensed installers and licensed maintenance providers working under the county's on-site sewage facility program.