Cost: $9,000–$18,000 for a conventional system. Engineered systems (mound, drip, aerobic) run higher — see the cost guide for the local ranges.
What decides the price
- Soil. The single biggest variable. Well-draining soil supports a simple gravity field; slow-draining or shallow soil forces a larger field or an engineered system.
- Bedrooms. Systems are sized by bedroom count.
- Lot access and terrain. Flat and open is cheap; wooded hillside means slower machine work and sometimes a pump chamber.
- Permit and inspections. County fees are modest; the contractor's design and inspection coordination are part of the quote.
Steps
- Site evaluation and soil test with the county
- System design and permit application
- Installation — tank, field or unit, pump chamber if required
- County final inspection before backfill and use
Buying land? A site evaluation before closing tells you what a system will cost — or whether the lot will support one at all.
All work is performed by TCEQ-licensed installers and licensed maintenance providers working under the county's on-site sewage facility program.